Navi Mumbai Metro Route & Map

The Navi Mumbai metro is considered as the rapid transit system which was built by City and Industrial Development Corporation (CIDCO). The reason behind the construction of this metro was to reduce traffic and ease pressure on the railway network of Mumbai. Therefore this transportation mode is much cheaper than the taxis and auto-rickshaws of Navi Mumbai. 

The Navi Mumbai metro was designed with five lines and covers a distance of about 106.4 km. The construction of the Navi Mumbai metro has developed the economic condition of the city and made the metro an important source of transportation system.

The operation of Navi Mumbai metro started on 17th November 2023 with no formal inauguration. This metro line was made because of the chief minister of Maharashtra Eknath Shinde who gave the order to CIDCO. On the day of the inauguration line – 1 of the Navi Mumbai metro operated from 3 PM to 10 PM between Belapur terminal and Pendhar and back. Later on, the CIDCO appointed Maha Metro as the metro rail operator of Navi Mumbai metro. 

The cost for the construction of this metro line–1 project was Rs. 3,400 crore out of which Rs. 2,600 crore was already infused by CIDCO. The foundation stone of the Navi Mumbai metro was laid on 1st May 2011. Therefore the Corridor – 1 route includes Pendhar, Kharghar, Kalamboli, and Khandeshwar and there is another plan made by the government to extend the route of Navi Mumbai metro up to International Airport (NMIA). The Navi Mumbai Metro Corridor – 1 is based on the detailed project report (DPR) made by the Delhi Metro Rail Corporation (DMRC).

The line – 1 of Navi Mumbai metro will cover up to 23.4 km and there will be 20 stations on this line. Line – 2 of the Navi Mumbai metro will cover a distance of up to 10.3 km and it will cover MIDC Taloja station to Khandeshwar, there will be 8 stations between these two stations. 

OperatorCity and Industrial Development Corporation (CIDCO)
Operation start17 November 2023
Number of lines1 Metro Lines
Train length3 Coaches
No. of stations11 Active Stations
Metro timings⏱ Starting | Ending
06:00 AM | 10:00 PM

Navi Mumbai Metro Lines & Terminal Stations 2024

Metro linesTerminal stations
Line 1 LineBelapur Terminal Pendhar

Navi Mumbai Metro Route Map 2024

Navi Mumbai Metro Fare Chart 2024

Distance Zones (KM)Fare (₹)
0 - 2₹ 10
3 - 5₹ 15
6 - 8₹ 20
9 - 11₹ 30
Above 11₹ 40

Navi Mumbai Metro’s fare prices structure and rules were announced on November 16, 2023. Fares are dependent the distance traveled.

Interesting Facts about Navi Mumbai Metro

  • The total number of metro lines in Navi Mumbai Metro is 1.
  • The total number of metro stations is 20.
  • The total length of Navi Mumbai Metro is 106.4 km, 23 km length is under construction and 83 km length is planned.
  • The total number of coaches in Navi Mumbai Metro is 3.
  • Navi Mumbai Metro is a rapid transit system.
  • The total estimated cost of Navi Mumbai Metro Line 2 from Taloje MIDC to Khandeshwar is Rs. 2820.20 crores.
  • The total number of stations between Taloje MIDC to Khandeshwar are 6.
  • The total estimated cost of Navi Mumbai Metro Line 3 from Taloje MIDC to Pendar is Rs. 1750.14 crores.
  • The total number of stations between Taloje MIDC to Pendar are 3.
  • The total estimated cost of Navi Mumbai Metro Line 4 from Khandeshwar to Navi Mumbai International Airport (NMIA) is Rs. 1270.17 crores.
  • Khandeshwar to Navi Mumbai International Airport (NMIA) stations are elevated and underground.

The Navi Mumbai metro consists of 1 metro line and in November 2011 construction of phase – 1 began but because of delays in approval and lack of government interest, it took a long time for its construction. 

In June 2019, the CIDCO granted DMRC the principal approval to implement Line – 2 and Line – 3 in Navi Mumbai. The Maharashtra government is also planning to propose a 106.40 km route with 6 lines for Navi Mumbai. 

In the mid of 2012, CIDCO awarded a 321 crore contract for the construction of 11.1 km from Belapur to Pendhar section to a Consortium of San Jose, Supreme Infrastructure, and Mahavira road Infrastructure in Navi Mumbai the project deadline was 2016 which was later extended to 2017 and then 2018 because as of January 2017, only 60% work of the Navi Mumbai metro station was done. The city and industrial development corporation which is the nodal agency for the Navi Mumbai metro project has approved the implementation of lines – 2, 3, and 4 with advanced mode of transport and Metroneo will be placed of standard gauge.

Navi Mumbai Metro History (key dates)

  • 17th November 2023: the operation began on line – 1 of Navi Mumbai metro.
  • 21st June 2023: Navi Mumbai receives a certificate from CMRC to start commercial operation of line – 1. 
  • October 2021: the phase 1 of Navi Mumbai was granted by RDSO certificate. 
  • 28th August 2021: Navi Mumbai trail for phase 1 began. 
  • July 2021: Maha Metro took the responsibility to maintain Navi Mumbai metro line – 1 for 10 years. 
  • May 2021: First trial run from Kharghar metro station to Taloja metro station began on Navi Mumbai metro. 
  • March 2019: 3 coach metro train arrived from China to Navi Mumbai metro. 
  • 1st May 2011: The foundation stone was laid for Navi Mumbai metro. 

Navi Mumbai Metro News & Updates 2024

Navi Mumbai Metro FAQs

𝒜. There will be normal checking of tickets at the metro station. The passenger needs to buy tickets before entering the metro trains and while exiting the metro tickets are probably checked by the system available on the metro station.

𝒜. It is prohibited by the authorities to bring pets to the metro station.

𝒜. Yes, they can bring but while entering the system available on the metro the passenger should hold their baby and fold the stroller.

𝒜. All the compartments which are provided by the Navi Mumbai metro are the same; there is no first-class compartment available.

𝒜. It is strictly prohibited by the authority of Navi Mumbai Metro to not take videos and pictures inside the train or at the station.

Views: 5428