Friday, February 14, 2025

Ahmedabad Metro Closing and Opening Time: A Complete Guide To Ahmedabad Metro

Share

The Ahmedabad Metro is a rapid transit network serving the cities of Ahmedabad and Gandhinagar in the Indian state of Gujarat. As of now, the system spans 58.66 kilometers (36.450 miles) and includes 39 stations. 

The construction of the Ahmedabad-Gandhinagar metro started on 14 March 2015 and a small section of the East-West corridor was launched on 4 March 2019 and opened for the public on 6 March 2019. On 30 September 2022, the rest of Phase-1 was inaugurated and accessible to the public on 2 and 6 October 2022, except for the Thaltej Gam end and three stations. 

This blog at metronearme.org provides useful information on Ahmedabad metro closing time, including routes, service hours, and a fare chart.

Ahmedabad Metro- Overview and History

  • In 2003, the Gujarat Infrastructure Development Board studied urban transportation between Gandhinagar and Ahmedabad. 
  • Following this, the Delhi Metro Rail Corporation submitted a comprehensive project report for the Ahmedabad Metro in June 2005, which received approval from the Central Government.
  • The project design for the Ahmedabad Metro was completed in 2008.
  • After six years, on October 19, 2014, the Union Cabinet of India sanctioned ₹10,773 crore for the Ahmedabad Metro Project. 
  • In November 2014, the Central Government also gave the green light for the use of Western Railways land along the Botad-Sabarmati meter gauge line.
  • Construction of the Ahmedabad Metro began in March 2016, with trial runs taking place in February 2019 over the 6.5 km (4.0 mi) long Vastral – Apparel Park section of Phase 1. 
  • The Ahmedabad Metro was officially inaugurated on March 4, 2019, by Indian Prime Minister Narendra Modi. 
  • Since then, it has been operational for the public, while additional construction continues.

Also Read:- Chennai Metro Timings Morning || Delhi Agra Jaipur Tour Packages

Things to Know About Ahmedabad Metro Route 

Things to Know About Ahmedabad Metro Route 
Things to Know About Ahmedabad Metro Route 
  • The Ahmedabad Metro is a rapid transit system designed to serve the cities of Ahmedabad and Gandhinagar in Gujarat, India. 
  • The Gujarat Metro Rail Corporation (GMRC) Limited, which is a Special-Purpose Vehicle (SVP) established by both the Government of India and the Government of Gujarat, is overseeing the construction of the Ahmedabad Metro.
  • This initiative includes two proposed lines: the North-South Line and the East-West Line. Currently, the East-West Line is operational and features six stations. 
  • The entire Ahmedabad Metro project is planned to cover 40 kilometers in Phase 1 and an additional 28 kilometers in Phase 2, with 6.5 kilometers already in operation.

System Specifications 

  • Top Speed: 80 kmph
  • Average Speed: 33 kmph
  • Track Gauge: Standard Gauge – 1435 mm
  • Electrification: 750 V DC Third Rail
  • Signaling: Communication-based Train Control (CBTC)

Key Figures

  • Operational: 60.06 km | Under Construction: 7.45 km | Proposed: 13 km
  • Daily Ridership: 90,000/day (March 2023)
  • Rolling Stock: 96 coaches (32 train sets x 3) supplied by Hyundai Rotem

Ahmedabad Metro Timings

  • The Ahmedabad metro starting time is 6:20 AM. 
  • The Ahmedabad metro closing time is 10:05 PM.
  • Wednesday peak hours are 8:00 AM to 11:00 AM and 5:00 PM to 8:00 PM. During peak hours the train comes at every 9 minutes. 
  • During non-peak hours, the train comes every 10 minutes.
  • On Saturday and Sunday, the train comes every  12 minutes.
Note: Check on the Ahmedabad Metro App for more detailed information about ticket prices, train timings, arrival, departure, and more. 
StationAhmedabad Metro Starting TimeAhmedabad Metro Closing Time
Vastral Gam (VTLG)06:20 Hrs22:00 Hrs
Thaltej (TLTJ)06:20 Hrs22:05 Hrs
Apparel Park (APMC)06:20 Hrs22:09 Hrs

Also Read:- Srinagar to Gurez Distance || Gangotri to Gomukh Distance

Ahmedabad Metro Station list

Ahmedabad Metro Station list
Ahmedabad Metro Station list
Sr no.Station NameLineLayout
1AECRed LineElevated
2AmraiwadiBlue LineElevated
3APMC †Red LineElevated
4Apparel Park †Blue LineElevated
5Commerce Six RoadBlue LineElevated
6Doordarshan KendraBlue LineElevated
7GandhigramRed LineElevated
8GheekantaBlue LineUnderground
9Gujarat UniversityBlue LineElevated
10Gurukul RoadBlue LineElevated
11Jivraj ParkRed LineElevated
12Kalupur Railway StationBlue LineUnderground
13Kankaria EastBlue LineUnderground
14Motera Stadium †Red Line Yellow LineElevated
15Nirant Cross RoadBlue LineElevated
16Old High CourtBlue Line
Red Line
Elevated
17PaldiRed LineElevated
18Rabari ColonyBlue LineElevated
19Rajiv NagarRed LineElevated
20RanipRed LineElevated
21SabarmatiRed LineElevated
22Sabarmati Railway StationRed LineElevated
23ShahpurBlue LineUnderground
24ShreyasRed LineElevated
25SP StadiumBlue LineElevated
26ThaltejBlue LineElevated
27UsmanpuraRed LineElevated
28VadajRed LineElevated
29VastralBlue LineElevated
30Vastral Gam †Blue LineElevated
31Vijay NagarRed LineElevated
32Sector-1 (Gandhinagar)Yellow LineElevated
33InfocityYellow LineElevated
34Dholakuva CircleYellow LineElevated
35RandesanYellow LineElevated
36GNLUYellow Line Violet LineElevated
37RaysanYellow LineElevated
38Koba GamYellow LineElevated
39Juna KobaYellow LineElevated
40Koba CircleYellow LineElevated
41Narmada CanalYellow LineElevated
42Tapovan CircleYellow LineElevated
43Vishwakarma CollegeYellow LineElevated
44Koteshwar RoadYellow LineElevated
45PDPUViolet LineElevated
46GIFT CityViolet LineElevated

Ahmedabad Metro Route & Map

Currently, 3 metro lines are active at Ahmedabad metro stations, namely, Blue Line, Red Main Line, and Red Branch Line. While the Blue Line runs from Thaltej Gam to Vastral Gam, the Red Main Line covers the distance from Motera Stadium to APMC. The Red Branch Line travels from GNLU and ends at Gift City. 

Metro LinesStatusStarting Terminal Ending Terminal 
Blue LineActiveThaltej GamVastral Gam
Red Main LineActiveMotera StadiumAPMC
Red Branch LineActiveGNLUGift City

Ahmedabad Metro Ticket Price

Ahmedabad Metro Ticket Price Ahmedabad Metro Closing and Opening Time: A Complete Guide To Ahmedabad Metro

Here is the estimated Ahmedabad metro ticket price.

No. of StationsMetro Token FareSmart Card Fare
0 – 3₹ 5₹ 4.50
4 – 7₹ 10₹ 9
8 – 11₹ 15₹ 13.50
12 – 15₹ 20₹ 18
Above 15₹ 25₹ 22.50

The permissible fares for travel within the GMRC network are as follows: 

  • Token
  • Smart card
  • Provisional paper ticket (to be used in case of AFC system failure)

The Ahmedabad metro officials have provided a fair distribution of tickets. 

  • For the first 2.5km, it will cost only Rs 5, and for the remaining 7.5 km, it will be Rs 10.
  • The first 6.5 km from Vastral Gam Metro Station to Apparel Park Metro Station cost Rs 10. 
  • The 21-km section of Vastral Gam to Thaltej costs between Rs 5 to Rs 15.
  • The fare for the first three metro stations is Rs 5, while the smart card ticket costs Rs 4.5.
  • After 3 stations, the price increases to Rs 10, whereas the smart card fare is Rs 9.
  • The maximum fare to travel by Ahmedabad metro is Rs 25.

Points to Remember

  • Children who are under 3 feet (90 cm) are permitted to travel when accompanied by an adult.
  • The purchased token remains valid for use on the day of purchase. 
  • The working day will be defined according to the schedule for Revenue Services. 
  • Travelers can purchase Fare Media/Products using either cash or POS (Debit/Credit Card).

Also Read:- Humayun Tomb Nearest Metro Station || Lodhi Garden Nearest Metro Station

Ahmedabad Metro: Facilities For Passengers

  • Contactless Smart Card: This is a type of card that uses radio-frequency identification (RFID) or near-field communication (NFC) technology for secure and convenient transactions. Travelers can recharge the card and use it for traveling. 
  • First Aid Assistance: Metro stations have first aid assistance and personnel trained for medical support in case of emergencies.
  • Passenger Information Display: Such displays provide real-time information to passengers about train arrival and departure, platform number, delays, or other information.
  • Drinking Water: For access to clean and safe drinking water, facilities are available at metro stations. 
  • Token Vending & Card Recharge Machines: These machines are installed at metro stations for token purchases and card recharge.
  • Lifts: Lifts are available for passengers, particularly handicapped and senior citizens to travel easily. 
  • Guiding Signage: Guiding Signage is signboards that display information like directions and ways to the platforms that help commuters travel conveniently. 
  • Restrooms: Clean and hygienic restrooms are available at metro stations for public access. 
  • Escalator: Escalators are moving stairs that also help in vertical movements within the metro station. They help passengers to move between platforms and concourse areas.

Conclusion

The Ahmedabad Metro service is a convenient and safe mode of traveling for the people of Ahmedabad. It offers them an easy, fast, convenient, safe, and cheap mode of commuting with a range of facilities available. Connecting a vast range of locations from north to south and east to west, the Ahmedabad metro service has become one of the most vital transportation systems between Gandhinagar and Ahmedabad, commuting thousands of passengers daily. 

FAQs

1) What is Ahmedabad metro closing time?

Ahmedabad metro closing time is 10:05 PM.

2) What is Ahmedabad metro opening time?

Ahmedabad metro opening time is 6:20 AM.

3) Is there a first-class compartment in Ahmedabad metro?

No, the Ahmedabad metro does not differentiate between passengers on the basis of first-class and second-class compartments. It is the same and equal for everyone. 

4) Can I take photographs in Ahmedabad metro?

Photography and videography are strictly prohibited in the Ahmedabad metro. For special purposes, one may ask the authority and get permission.

Also Read:- Sarojini Market Nearest Metro || Nearest Metro Station to Iskcon Temple Delhi

Read more

Local News